Premium villas in the heart of Canggu (006492)
- Apartment size 280 m² - 348 m²
-
Rooms
- 3 bedrooms
- 4 bedrooms
- Сomplete construction 2024
- Furniture Partly
- Location: Indonesia, Bali, Canggu
- Balcony/ Terrace
- Swimming pool
- Private territory
- Management company
- 0% installment
- Garden
The villa complex is located in Canggu, a 3-minute drive from the beach, a 1-minute walk from Fitness Plus and Enso Sushi, 2
minutes walk from Amo Spa, 10 minutes walk from Cafe Revolver, Doppio and many restaurants, supermarkets, organic food stores.
Canggu was once a largely rural area away from the beaches, but has developed rapidly and is now popular
tourist suburb of Denpasar.
Nelayang Beach is a place where you can buy fresh fish, lobster, shrimp, etc. every morning.
Canggu is still popular with surfers and the water is clear. The area is still a hilly area with rice fields.
Villa layouts:
- 3 bedrooms area 280.15 m2, plot area 231 - 237 m2
- 4 bedrooms area 306.74-348.22 m2, plot area 251 - 265 m2
Beautiful rooftop with fully functioning kitchen and spacious living room.
Designer furniture was custom made especially for the villas.
Ideal for business and life. The villas are built to the highest safety standards and
construction. A warranty is provided on structure, waterproofing, anti-termite treatment and general defects.
24-hour security and concierge service will ensure safe and comfortable accommodation.
Bright living room, decorated in Japanese style. A spacious classic dining area is combined with a modern two-level TV lounge, and together they create the perfect combination of convenience and beauty.
The bedroom and workspace are located on the second floor. Nothing will disturb your sleep or work flow thanks to sound insulation.
Natural wood in the decorations adds special comfort and charm. A balcony, large windows, spacious closets and a separate bathroom will add the necessary amenities.
Terms of payment:
- 35% down payment with interest-free installments
29 YEAR LEASE WITH PRIORITY RIGHT TO RENEW
Construction completion date: 3rd quarter 2023 - 2nd quarter 2024
Information updated: 15.10.2024