Modern residential complex by the sea with rich infrastructure in Avsallar (008104)
- Apartment size 67 m² - 195 m²
-
Rooms
- 1 bedroom
- 2 bedrooms
- 3 bedrooms
- 4+1 penthouse
- Сomplete construction 2027
- Furniture Partly
- To the beach: 1000 m
- Location: Turkey, Alanya, Avsallar
- To the airport: 69 km
- To the city centre: 25 km
- Balcony/ Terrace
- Swimming pool
- Private territory
- Outdoor parking
- 0% installment
- Security
- Elevator
- Playground
- Generator
Residential complex in Avsallar is a modern project, which includes 153 apartments and consists of 2 blocks of 9 floors each, the total area is 9,070 m².
The complex offers a variety of layouts for comfortable living:
- 1+1 area 67 m²
- 2+1 area 86 -115 m2
- 3+1 area 141 - 179 m2
- 4+1 duplex 195 m2
Just 1 km from the popular beaches of Incekum and Avsallar, this project combines the comfort of city life with proximity to nature and the sea.
Main advantages:
- Location: 1 km from the sea, 1 km from shops and restaurants, 1.5 km from Incekum forest camp for nature walks, 25 km from the center of Alanya
- Infrastructure for family and active recreation: mini-playground-club, children's playroom, children's pool and water park
- Relaxation and rest: SPA, sauna, Turkish bath, jacuzzi, relaxation room and outdoor pool
- Fitness and sports: fitness center, massage room, tennis, basketball and volleyball courts
- On-site amenities: cafe-bistro, gazebos with barbecue area, green areas and recreation areas
Other amenities and features of the complex:
- High-speed elevators and generator
- Outdoor and indoor parking
- Video intercom, reception and satellite dish
- Wi-Fi access throughout the territory, including the pool and cafe
Payment plan:
1 method
- 5 % payment upon signing the contract
- 20% after signing the contract
- 75% in equal monthly interest-free payments until completion of construction
2nd method
- 5% upon signing the contract
- 95% payment: within 30 days after signing the contract (7% discount on the sale amount)
Construction start date: 30.06. 2025
Construction end date: 30.06. 2027
Information updated: 14.11.2024