New residential complex under construction in Oba (016443)
- Apartment size 67 m² - 188 m²
-
Rooms
- 1 bedroom
- 2 bedrooms
- 2+1 penthouse
- 3+1 penthouse
- 4+1 penthouse
- Сomplete construction 2025
- Furniture Partly
- To the beach: 2500 m
- Location: Turkey, Alanya, Оба
- To the airport: 42 km
- To the city centre: 4 km
- Balcony/ Terrace
- Swimming pool
- Private territory
- Outdoor parking
- Security
- Elevator
- Playground
- Generator
- Shuttle to the beach
Exquisite luxury project in Alanya, Oba district, combining greenery and comfort.
The project features iconic architecture and the comfort of a five-star hotel.
With solar panels on rooftops, we are aiming for a low carbon future for everyone.
Plot area: 6581 m2.
The residential complex consists of 4 blocks of 96 apartments of various layouts. The modern design of the project is developed
leading architectural bureau of Alanya.
You can choose from:
- 1+1 (51 m2 - 72.5 m2)
- 2+1 (74 m2 - 145 m2)
- 3+1 (137 m2 - 195 m2) *some with terrace, others duplexes
- 4+1 Duplex (158 m2)
Infrastructure of the complex:
- outdoor swimming pool (XXX m2)
- children's pool (XX m2)
- indoor heated pool (XX4 m2) with Jacuzzi
- outdoor heated pool (XX M2)
- rooftop solar panels
- music system in common area
- outdoor jacuzzi
- gym (XX m2)
- Turkish bath (hammam)
- transfer to the beach
- a guest room
- sauna
- steam room
- massage room
- salt room
- lobby and lounge area with bar
- games room with billiards and table tennis
- mini cinema
- playground
- landscape garden with fountains
- open, including places for bicycles
- outdoor playground
- footpath
- gazebos
- 24/7 security
- elevators in each block
- electric generator
- video surveillance system
- satellite TV
All infrastructure is located in blocks A and B
PAYMENT
Monthly installs with 40% payment
If the Customer wants to leave the last payment at the time of delivery Max. 10%
60% prepayment > 2% discount
40% prepayment + 6 month payment plan > 2% discount
100% payment (within 7 days) > 5% discount
Construction start date: 04.2023
Construction completion date: 04.2025
Information updated: 25.10.2024