For sale 5.5MWt/h operating Hydroelectric Power Plant in Dusheti region, Georgia (001501)
-
Location
Georgia
For sale 5.5MWt/h operating Hydroelectric Power Plant in Dusheti region, Georgia.
Location:
– North-Eastern Georgia, Dusheti Municipality, 2000m above sea level.
– Eastern part of the Caucasus Mountains, 65km from the center of Dusheti, 120km from Tbilisi, capital of Georgia.
– 100% Renewable Green Energy, no emissions, no pollution and no harm to the environment.
Area and premises:
– 4 Cascade Hydroelectric Power Plants (HPP) located 2.5km from each other, with a capacity of 1.5MWt/h, 1.0MWt/h, 2.0MWt/h, 1.0MWt/h. Totally 5.5MWt/h
– 4 CINK Hydro Turbines (Czech Republic), 4 MarelliMotori generators (Italy) with a 25-year manufacturer's warranty, SIEMENS control cabinets, Georgian Cables and Wires SAKCABLE (GE)
– 3 Transformers 0.4kV/10kV
– 1 Transformer 10kV/35kV, 10000kVA
– Total land area 800m2 + land area across every object.
Status:
– Operating hydroelectric power plant with 4 segments, built in 2022, powered on in 2023.
– All necessary equipment for control and maintenance, software for control and collection of statistics on the operation of turbines and generators, control of the temperature of rooms and moving parts of the turbine, water intake control.
– 10 permanent employees, mechanics, electricians, engineers, security, accountant, director.
– The power plant is connected to the general energy system of Georgia via a 35 kV line.
– Satellite Internet, 4G LTE Internet, video surveillance at all 4 objects, the possibility of connecting an optical line from Dusheti.
Equipment and licenses:
– A fully operational station generating income 24/7 by selling electricity.
– All necessary licenses from the Ministry of Energy and the Ministry of Nature Protection of Georgia, permits from the Dusheti Municipality and the Hydrology Committee of Georgia.
– There is a warehouse, utility rooms, tech rooms inside every block of station.
Business potential:
– Possibility of selling generated electricity to private companies in Georgia or to the State Grid of Georgia.
– Possibility of using generated electricity for own needs.
– Possibility of constructing a Mining Farm for generating pure BTC, LTC, DOGE, BCH on the own territory of the station.
– Median temperature of the area +4°C or 39.2 °F, no dust, no pollen, no factories or houses nearby.
– Possibility of expansion and installation of an additional turbine of 500 kW/h in future.
Price and terms of sale:
– Cost $13,500,000 no hidden fees, no extra taxes for the buyer.
– Company registration and sale of the station with all equipment and employees, current management willing to stay through a transition period.
– Possibility of payment in cryptocurrency, bank transfer, cash.
Upon subscription, you’ll be prompted to complete a brief survey gathering essential details about your business, enabling us to craft tailored CRO strategy. You’ll receive instructions for granting our team access to your website platform, along with credentials to access our project management tool. There, you can monitor, review, and approve each step of your CRO journey.
Upon subscription, you’ll be prompted to complete a brief survey gathering essential details about your business, enabling us to craft tailored CRO strategy. You’ll receive instructions for granting our team access to your website platform, along with credentials to access our project management tool. There, you can monitor, review, and approve each step of your CRO journey.

According to these data, the optimal length of a video is up to 2 minutes, and then the engagement of viewers drops with every second. BuzzSumo also received similar results – according to their data, more users are attracted to videos of 1-1.5 minutes.
Upon subscription, you’ll be prompted to complete a brief survey gathering essential details about your business, enabling us to craft tailored CRO strategy. You’ll receive instructions for granting our team access to your website platform, along with credentials to access our project management tool. There, you can monitor, review, and approve each step of your CRO journey.
Upon subscription, you’ll be prompted to complete a brief survey gathering essential details about your business, enabling us to craft tailored CRO strategy. You’ll receive instructions for granting our team access to your website platform, along with credentials to access our project management tool. There, you can monitor, review, and approve each step of your CRO journey.
Upon subscription, you’ll be prompted to complete a brief survey gathering essential details about your business, enabling us to craft tailored CRO strategy. You’ll receive instructions for granting our team access to your website platform, along with credentials to access our project management tool. There, you can monitor, review, and approve each step of your CRO journey.
catalog of Top 10
buildings in Alanya
62 000 € - 460 000 €) and get access to current
offers with prices from developers (no commission).
2025