Unique residential complex in the center of Alsancak, Izmir (003132)
- Apartment size 84 m² - 377 m²
-
Rooms
- 1 bedroom
- 2 bedrooms
- 3 bedrooms
- 4 bedrooms
- 3+1 penthouse
- Сomplete construction 2023
- Furniture Partly
- To the beach: 720 m
- Location: Turkey, Izmir
- Sea view
- Balcony/ Terrace
- Swimming pool
- Private territory
- Security
- Elevator
- Playground
- Generator
A magical project located in the heart of Alsancak, very close to transport hubs and a few steps from one of the largest private hospitals in Izmir - Medicana.
The combination of convenient location, variety of apartment layouts and extensive social infrastructure makes this complex attractive to a diverse audience.
Distance to the sea 720 meters.
Location and infrastructure:
- Ege University: 7.3 km
- Dokuz Eylul Hospital: 8.7 km
- Yaşar University: 5.5 km
- International Hospital Medicana: 500 m
- Private Hospital Ege City: 2.0 km
- Aegean University Hospital: 6.2 km
- Park of Culture: 2.0 km
- Alsancak Port: 2.0 km
- Adnan Menderes Airport: 18 km
- Alacati Cesme: 55 min
- Urla: 40 min
- Manisa: 30 min
- Aydin: 55 min
- Kusadasi: 1 hour
Social infrastructure:
- Outdoor and children's pools
- Cafeteria
- Closed parking
- Fitness, Pilates and yoga centers
- Spa and sauna
- Changing rooms for men and women
- Lobby and seating area
- Library
- Gaming
- Office
- 24/7 security and video surveillance
Equipment and amenities:
- Built-in household appliances
- VRV heating and cooling system
- Water and electricity meters
- Generator
- Indoor parking with automatic license plate reading system
- Terraces and private gardens
- Automatic watering system for terraces and public gardens
Safety:
- Surveillance cameras in public areas and at entrances
- Fire alarm and automatic fire extinguishing system
- Fire cabinets on every floor
- Security alarm, water and fire detectors, videophone in apartments
Apartment types:
- 1+1: 83 m2 gross
- 2+1: 164 m2 gross
- 3+1: 214 – 337 m2 gross
- 3+1 duplex
- 4+1: 280 m2 gross
Construction start date: 11.2022
Construction completion date: 12.2023
Information updated: 25.06.2024