Modern apartments in a new residential complex in Gazipasa (017473)
- Apartment size 60 m² - 105 m²
-
Rooms
- 1 bedroom
- 2 bedrooms
- Сomplete construction 2024
- Furniture Partly
- To the beach: 1500 m
- Location: Turkey, Alanya, Gazipasha
- To the airport: 4 km
- To the city centre: 45 km
- Balcony/ Terrace
- Swimming pool
- Private territory
- Outdoor parking
- Tennis court
- Elevator
- Playground
- Generator
A new project in one of the most investment-attractive places - in Pazardzhi - a modern district of the city of Gazipasa.
Gazipasa is a region of the Mediterranean, the active development of which started after the opening of an international class airport.
A 10-storey residential complex is being built just 5 minutes from the city center.
Within walking distance there is a hospital, schools and kindergartens, supermarkets, cafes and restaurants, a well-maintained embankment with children's playgrounds. And the sandy shore, the stunning beauty of the bay and the lagoon - this is what attracts everyone here.
Buying an apartment in this project will be interesting for both permanent residence and investment.
The complex has 68 apartments of the following layouts:
- 1+1 (60-70m2),
- 2+1 (105m2).
The apartments will be handed over with a fine finish, a kitchen set and a fully equipped bathroom.
The complex boasts a range of impressive amenities and facilities, from a large outdoor swimming pool to a state-of-the-art fitness center.
Also for residents are provided:
- Bar by the water
- indoor pool
- Barbecue area
- Outdoor sports grounds
- Tennis court
- Green area
- Hamam
- Sauna
- Cinema
- Billiards
- outdoor parking
- Closed parking (paid)
- Concierge
The complex is also ideal for families with children, as the infrastructure of the complex takes into account the wishes of the little residents: a children's playroom with a variety of toys, a playground with swings, a pool with water slides and many outdoor areas for active games.
To top it all off, the complex has a 24/7 security system to ensure the safety of its residents.
The construction of the complex starts on February 1, 2023 and will last until August 30, 2024.
Also, until the end of construction, payments in installments with an initial payment of 40% are provided.
Information updated: 22.02.2024