New residential complex 100 meters from the sea in Kargicak, Alanya (001107)
- Apartment size 50 m² - 105 m²
-
Rooms
- 1 bedroom
- 2 bedrooms
- Сomplete construction 2023
- Furniture Partly
- To the beach: 100 m
- Location: Turkey, Alanya, Kargicak
- To the airport: 25 km
- To the city centre: 15 km
- Sea view
- Panoramic view
- Balcony/ Terrace
- Swimming pool
- Private territory
- Outdoor parking
- 0% installment
- Beachfront
- Garden
- Elevator
- Playground
- Generator
The new residential complex will be built on Eski Gazipasa Avenue in Kargicak Mahallesi, 100 meters from the sea and only 25 km from Gazipasa Airport.
Sector/Plot: 841/8
Total area: 3005 M2
The number of independent units for sale: 53 dwellings.
General information on the complex:
- А Block Apartments 1+1 ( 15 units on 2.3. 4. floors) 50 - 52m2 1 Hall, 1 Bedroom, 1 Bathroom WC, 1 Balcony
- A Block Apartments 2+1 85 m2 Antre, 1 Hall, 2 Bedroom, 2 Bathroom WC, 1 Balcony
- A Block Apartments Duplex 2+1 105 m2 Antre, 1 Hall, 2 Bedroom, 3 Bathroom WC, 2 Balcony
- A Block Apartments Duplex 4+1 175 m2 Antre, 1 Hall, 4 Bedroom, 3 Bathroom WC, 5 Balcony
- B Block Apartments 1+1 50 – 52 m2 Antre, 1 Hall, 1 Bedroom, 1 Bathroom WC, 1 Balcony
- B Block Apartments Duplex 2+1 100 m2 Antre, 1 Hall, 2 Bedroom, 3 Bathroom WC, 2 Balcony
- B Block Apartments Duplex 3+1 130 m2 Antre, 1 Hall, 3 Bedroom, 3 Bathroom WC, 4 Balcony
Note: apartments will be rented unfurnished.
Technical capabilities:
- Video surveillance system
- doorman
- Elevator
- Generator
- Landscaping of Social Zones and Water Walls
- Air conditioning system
- The 3-phase infrastructure of the electric water heating system
- Electrical cabling infrastructure suitable for Smart Home equipment
- The infrastructure of telephone and Internet lines
- Videos intercom
- Kitchen cabinets, radiators, and showers
Recreation areas:
- Open pool
- Indoor pool
- Fitness and step aerobics hall
- Sauna
- Turkish Hamam (Special)
- Spa Center (Special)
- Barbecue and seating area
- Playground
- Payment Methods
30% down payment, the rest in installments up to 9 months.
Construction schedule:
- Construction start date: 01.10.2021
- Completion date: May 31, 2023
Information updated 16.07.2024